PROJECT ENGINEERING
is a leader in the movement and installation of new or
used plant and equipment.
Whether you are installing new equipment or moving a plant
across the world, the JIM turnkey package is at your disposal.
|
|
|
It includes, inspection, dismantling, packing, shipping, transportation,
erection and assistance with commissioning.
If we're moving used plant, we'll give
you a comprehensive report on any maintenance or repair needed before
re-assembly.
Every JIM project is handled by a dedicated
project engineer and a team of logistics experts, engineers and technicians
with an array of heavy duty lifting, moving and installation equipment
at their disposal.
JIM will even custom design solutions
to difficult logistic, moving or erecting problems. |
The
benefit to you?
Simple. Accountability is lodged with
a single, reputable contractor with an internationally successful
track record.
|
|
|
We've
found solutions for these!
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
KUALA
LUMPUR SENTRAL |
|
The
Problem:
The client had a problem of lifting pre-roll formed 45-metre
long sheets to the roof for installation, without damage.
|
|
JIM's
Solution:
Erecting a 46-metre high structure from ground level,
rigging a device to lift and secure the roll-former at
roof height. Sheets were then roll-former directly onto
the roof and installed without damage. |
|
|
|
|
|
|
|
|
|
|
|
|
HICOM
FREIGHTMATE, RAWANG
SME, SG BULOH
HONG LEONG YAMAHA, SHAH ALAM/SG BULOH PERODUA, SHAH ALAM
HITACHI CHEMICALS, JOHORE |
|
The
Problem:
Removal and installation of various types of presses up
to 4,500 tonnes capacity inside buildings with height
restrictions and floor loading problems. |
|
JIM's
Solution:
Using JIM's custom-built mechanical and hydraulic gantry
cranes to remove and install the presses. |
|
|
|
|
|
|
|
|
|
|
|
NESTLE
SURABAYA TO NESTLE MALAYSIA |
|
The
Problem:
Relocation of a 60 tonne, 18 metre long food process dryer
from Surabaya to Malaysia, with minimal packing and without
damaging the insulation. Normal lifting position of the
dryer is at the body with the insulation removed. |
|
JIM's
Solution:
Designing lifting frames fitted to the footing of the
dryer, custom building spreaders for lifting and engaging
a small heavy-lift vessel for ocean transport. |
|
|
|
|
|
|
|
|
|
|
|
BATU
SAPI POWER STATION, SANDAKAN |
|
The
Problem:
Moving and installing 2 units of 280 tonnes each diesel
engines in a remote area with no load bearing floors inside
the building and 2 x 3 metres deep and 7 metres long pits
to cross before reaching the foundation slab. |
|
JIM's
Solution:
Custom building a 50 metre long steel platform extending
over the floor and the pits onto the foundation slab,
skidding and jacking the diesel engines onto its final
position. |
|
|
|
|
|
|