JIM PROJECT ENGINEERING
is a leader in the movement and installation of new or used plant and equipment.
      Whether you are installing new equipment or moving a plant across the world, the JIM turnkey package is at your disposal.
      It includes, inspection, dismantling, packing, shipping, transportation, erection and assistance with commissioning.
     If we're moving used plant, we'll give you a comprehensive report on any maintenance or repair needed before re-assembly.
     Every JIM project is handled by a dedicated project engineer and a team of logistics experts, engineers and technicians with an array of heavy duty lifting, moving and installation equipment at their disposal.
     JIM will even custom design solutions to difficult logistic, moving or erecting problems.
     The benefit to you?
     Simple. Accountability is lodged with a single, reputable contractor with an internationally successful track record.

 

We've found solutions for these!

   
KUALA LUMPUR SENTRAL
 
HICOM FREIGHTMATE, RAWANG
SME, SG BULOH
HONG LEONG YAMAHA, SHAH ALAM/SG BULOH PERODUA, SHAH ALAM
HITACHI CHEMICALS, JOHORE

 

NESTLE SURABAYA TO NESTLE MALAYSIA
 
BATU SAPI POWER STATION, SANDAKAN
 
 
 
 
 
 
 
 
 
KUALA LUMPUR SENTRAL

The Problem:
The client had a problem of lifting pre-roll formed 45-metre long sheets to the roof for installation, without damage.
 
JIM's Solution:
Erecting a 46-metre high structure from ground level, rigging a device to lift and secure the roll-former at roof height. Sheets were then roll-former directly onto the roof and installed without damage.
 
 
 
 
 
 
HICOM FREIGHTMATE, RAWANG
SME, SG BULOH
HONG LEONG YAMAHA, SHAH ALAM/SG BULOH PERODUA, SHAH ALAM
HITACHI CHEMICALS, JOHORE

The Problem:
Removal and installation of various types of presses up to 4,500 tonnes capacity inside buildings with height restrictions and floor loading problems.
 
JIM's Solution:
Using JIM's custom-built mechanical and hydraulic gantry cranes to remove and install the presses.
 
 
 
 
 
 
 
NESTLE SURABAYA TO NESTLE MALAYSIA

The Problem:
Relocation of a 60 tonne, 18 metre long food process dryer from Surabaya to Malaysia, with minimal packing and without damaging the insulation. Normal lifting position of the dryer is at the body with the insulation removed.
 
JIM's Solution:
Designing lifting frames fitted to the footing of the dryer, custom building spreaders for lifting and engaging a small heavy-lift vessel for ocean transport.
 
 
 
 
 
 
BATU SAPI POWER STATION, SANDAKAN

The Problem:
Moving and installing 2 units of 280 tonnes each diesel engines in a remote area with no load bearing floors inside the building and 2 x 3 metres deep and 7 metres long pits to cross before reaching the foundation slab.
 
JIM's Solution:
Custom building a 50 metre long steel platform extending over the floor and the pits onto the foundation slab, skidding and jacking the diesel engines onto its final position.